Performance
Period | Project | Owner |
---|---|---|
2023.02 ~ Present | NDE Service for Pyeongtaek hydrogen production base construction | KOGAS |
2023.01 ~ 2023.12 | NDE Service for 2023 Gwangju Jeonnam Regional Headquarter | KOGAS |
2018.11 ~ 2020.08 | Detailed Inspection and Maintenance Construction of Long-Period Storage Tank (TK-204) in Tongyoung Station | DOOSAN HI |
2017.10 ~ 2019.12 | Terminal Division and Other Facilities Extension Construction | KOGAS |
2016.12 ~ 2021.03 | Detailed Inspection and Maintenance Construction of Long-Period Storage Tank (TK-202) in Tongyoung Station | KYEONGNAM ENTERPRISES |
2015.10 ~ 2017.01 | Detailed Inspection and Maintenance Construction of Long-Period Storage Tank (TK-202) in Incheon | KOREA GAS TECHNOLOGY CORPORATION |
2014.04 ~ 2017.05 | LNG Tank #10 Construction in Samcheok | KOGAS |
2012.04 ~ 2013.12 | Vaporization Transmission Equipment in Tongyeong | KOGAS |
2007.12 ~ 2011.05 | Storage Tank #18, 19 Construction in Pyeongtaek | KOGAS |
2004.08 ~ 2005.10 | Vaporization Transmission Equipment in Plant 2 in Pyeongtaek | KOGAS |